Jannadi, O A and Almishari, S (2003) Risk Assessment in Construction. Journal of Construction Engineering and Management, 129(05), 492–500.

Kim, K and de la Garza, J M (2003) Phantom Float. Journal of Construction Engineering and Management, 129(05), 507–17.

Koehn, E & and Datta, N K (2003) Quality, Environmental, and Health and Safety Management Systems for Construction Engineering. Journal of Construction Engineering and Management, 129(05), 562–9.

Lu, M (2003) Simplified Discrete-Event Simulation Approach for Construction Simulation. Journal of Construction Engineering and Management, 129(05), 537–46.

Lu, M, Anson, M, Tang, S L and Ying, Y C (2003) {[}HKCONSIM{]}: A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong. Journal of Construction Engineering and Management, 129(05), 547–54.

Moodi, F and Knapton, J (2003) Research into a Management System for Diagnosis, Maintenance, and Repair of Concrete Structures. Journal of Construction Engineering and Management, 129(05), 555–61.

Nasir, D, McCabe, B and Hartono, L (2003) Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model. Journal of Construction Engineering and Management, 129(05), 518–27.

Ogunlana, S O, Li, H and Sukhera, F A (2003) System Dynamics Approach to Exploring Performance Enhancement in a Construction Organization. Journal of Construction Engineering and Management, 129(05), 528–36.

Shen, Q and Liu, G (2003) Critical Success Factors for Value Management Studies in Construction. Journal of Construction Engineering and Management, 129(05), 485–91.

Shohet, I M and Frydman, S (2003) Communication Patterns in Construction at Construction Manager Level. Journal of Construction Engineering and Management, 129(05), 570–7.

Soibelman, L, Liu, L Y, Kirby, J G, East, E W, Caldas, C H and Lin, K (2003) Design Review Checking System with Corporate Lessons Learned. Journal of Construction Engineering and Management, 129(05), 475–84.

Zhang, N and Tiong, R (2003) Integrated Electronic Commerce Model for the Construction Industry. Journal of Construction Engineering and Management, 129(05), 578–85.

Zhong, D H and Zhang, J S (2003) New Method for Calculating Path Float in Program Evaluation and Review Technique (PERT). Journal of Construction Engineering and Management, 129(05), 501–6.

  • Type: Journal Article
  • Keywords: Computation; Scheduling; Uncertainty; Critical path method; Construction; construction industry; project management; scheduling; planning; uncertainty handling;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(501)
  • Abstract:
    The path float use in the network is an effective method used to cope with various uncertainties existing within the construction. However, the current path float calculating method may bring misleading information to the managers on site and then cause project duration risk in the construction. The purpose of this paper is to present a new method, which calculates the noncritical path float in the program evaluation and review technique (PERT), to copy with the uncertainties within the network implementation, and to reduce the misleading information. An example network was analyzed with the new method, the results showed the consistent path float under required completion probability and required duration. The new path float concept will bring useful planning information to the managers and the planners in the construction.